How to run a quarterly Jira access review for SOC 2 and ISO 27001
In this guide
A quarterly Jira access review that passes an audit is four things: a dated list of who can access each in-scope space, a Keep, Revoke or Exception decision with a reason for every grant, the removals done in Jira, and a sign-off. This guide builds each part with native Jira and Atlassian Administration first, then shows the same review in AccessRadar.
AccessRadar is an access review app for Jira Cloud from Radrly. The native method works on any site, so start there if you review a handful of spaces.
Set the scope
Write down which spaces are in audit scope and which permissions count. Browse spaces and Administer spaces are the usual minimum, with Create, Edit and Delete work items where the data is sensitive. Add Jira and site admins as their own group, because they can reach every space. Record the date and who defined the scope. Keep the same scope next quarter so the reviews can be compared.
Freeze who has access
In Atlassian Administration, open Directory, then Users, and select Export users. Include group membership and app access. Atlassian emails you a CSV with each user's status, groups, app roles and a Last seen column per app (Export users from a site).
The CSV knows groups, not spaces. For space access, go to Settings, then Work items, then Permission Schemes, and note which space roles, groups, application access or single users hold each in-scope permission (Grant or revoke permissions in a scheme). Then list the people in each role per space: Space settings, then People in company-managed spaces, or Access in team-managed spaces (Add users and agents to space roles). Save every file with the date in its name.
Decide every grant, with a reason
Add Decision, Reviewer and Justification columns. Keep is the default; Revoke and Exception need a reason someone else can understand next year. For a doubtful row, Settings, then System, then Permission helper shows what one user can do on one work item and why an action fails (Check a user's access from a work item). It checks one person on one work item, so use it for spot checks, not the whole review.
Exceptions that end on a date
"Temporary" is the row auditors read twice. Give every exception an expiry date and an owner, and carry open exceptions into next quarter's sheet. Nothing in Jira ends the access on that date, so put a reminder in your calendar.
Remove access, then prove it
Remove revoked access in Jira or in Atlassian Administration, usually by removing the person from a group or a space role. Then export again and compare the two files on user ID. The Jira audit log records permission changes and users added to groups and roles, but for changes made in user management pages it does not show who made them, and it is not available when every Jira app on the site is on the Free plan (Audit activities in Jira).
Sign off and file the evidence
The control owner approves the review, and the approval goes into the evidence folder with the dated access list, the decisions, the open exceptions and the before and after exports. One folder per quarter, named by date.
Where the manual method gets hard
- Joining groups to spaces through roles and schemes is the slow part, and it is a long open suggestion: JRACLOUD-71967.
- A spreadsheet accepts an empty justification and edits after the review closed.
- If access changes while the review is open, nobody notices that a decision is now about different access.
- Next quarter you rebuild the whole list, because Jira keeps no dated record of who had access.
The same review in AccessRadar
AccessRadar is read-only and runs on Atlassian. In Jira administration, open Apps and select AccessRadar. Features are on Standard and Advanced unless marked Advanced.
- Scope. In Settings, choose up to 20 Key permissions. The defaults are Browse spaces, Create, Edit and Delete work items, and Administer spaces. Optionally turn on Require justification when keeping access.
- Snapshot. On Snapshots, select Take snapshot now, or use the schedule (weekly on Standard, daily or weekly on Advanced). Check that the snapshot is complete; partial snapshots are labelled.
- Signals first. Overview shows risk indicators such as anonymous access, deactivated accounts with access, Jira administrators and wide space admin access. Changes compares this snapshot with last quarter's.
- Start the review. On Reviews, select Start review, name it and choose the scope: the whole site (all spaces, Jira admins and application access), selected spaces, or selected groups for a membership review. Set the base snapshot, choose last quarter's snapshot under Compare with (optional) so new access shows as New since comparison, and set a due date.
- Decide. Choose Keep, Revoke or Exception for each item. Revoke and Exception need a justification of at least 10 characters, and an exception needs an expiry date at most 366 days away. The Why detail shows the group, role and scheme behind the grant. On Advanced, Suggest review order (AI) proposes an order; it is advice only and the reviewer decides every item.
- Recheck. If access changed in a newer complete snapshot, a banner appears. Use Show items to recheck and decide those items again.
- Remove in Jira. Revoke decisions are listed as Remove manually in Jira. An admin removes the access in Jira.
- Close. Export the review as CSV, PDF, Markdown or JSON; every export carries a coverage and limitations statement. On Advanced, Sign off records the signer, an attestation and a SHA-256 evidence hash and locks the review, Download evidence pack builds the PDF for your auditor, and at the next snapshot Remediation shows whether each revoke happened.
- Make it recurring (Advanced). On Campaigns, create a campaign with a Quarterly schedule, the whole site, selected spaces or space categories, and assign it to space leads. Space leads review on the Access review page in their space settings, under AccessRadar, and a Jira admin signs. Reminders are in the app only, so tell space leads through your usual channels.
One limit to plan around: Jira gives apps no last sign-in data, so AccessRadar cannot tell you that access goes unused. Keep the Last seen column from the native user export next to the review.
Quick answers
How often should you review Jira access for SOC 2 or ISO 27001?
Quarterly is common. Your auditor and your own access control policy set the frequency; the evidence matters more than the calendar: a dated access list, a decision for each grant and proof that removals happened.
Can Jira export who has access to each space?
Not in one file. Atlassian Administration exports users with their groups and app access as CSV, and permission schemes show which roles and groups hold each permission, but joining the two per space is manual. This gap is tracked publicly as JRACLOUD-71967.
Does AccessRadar remove access in Jira?
No. AccessRadar is read-only. A Revoke decision is listed as Remove manually in Jira, an admin removes the access in Jira, and on Advanced the next snapshot shows whether the revoke happened.
Does the AccessRadar evidence pack make you compliant?
No. The Advanced evidence pack maps the review to SOC 2 CC6.1, CC6.2 and CC6.3, ISO/IEC 27001:2022 A.5.15, A.5.18 and A.8.2, and NIS2 Art. 21(2)(i) and (f) as a supporting interpretation. It is not certification or an auditor's opinion.